3 September 2014. Another 1,647 megawatts of electric power have been added to the Abu Dhabi electric power grid, as the Shuweihat 3 power plant goes into production.

KHALEEJ TIMES

http://www.khaleejtimes.com/biz/inside.asp?section=uaebusiness&xfile=/data/uaebusiness/2014/September/uaebusiness_September35.xml

 

You can post comments after registration