8 August 2017. This expansion, called Bumbuna II, will be located on the Upper Seli River in the northeast part of the country. It will be built by Joule Africa and Energy Services Company (ESCO) through joint ownership of the newly formed Seli Hydropower. Seli Hydropower will also own and operate Bumbuna II.

HYDROWORLD

http://www.hydroworld.com/articles/2017/08/joule-africa-sierra-leone-sign-25-year-ppa-for-50-mw-bumbuna-expansion.html

At industryabout.com:

Sierra Leone Industrial Map

 

You can post comments after registration