16 February 2015. The Pilgrim nuclear power plant will be shut down during the blizzard on Saturday and Sunday to avoid a repeat of problems that occurred during the Jan. 27 storm, which resulted in a 12-day shutdown.

WICKED LOCAL HARWICH

http://harwich.wickedlocal.com/article/20150214/NEWS/302159997

You can post comments after registration