September 2017
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

9 November 2014. An engineering team's preliminary investigation released early this afternoon determined that a voltage problem in one of the electrical panels supplying power to the the pumps that keep the reactor supplied with fresh, purified water and the fuel rods submerged led to the automatic shutdown.

CLEVELAND.COM

http://www.cleveland.com/business/index.ssf/2014/11/perry_nuclear_power_plant_shut_1.html

 

You can post comments after registration