contentmap_plugin
made with love from Joomla.it

 

  • Type: Hydro Power Plant
  • Area: Espírito Santo
  • River: Benevente
  • Power Capacity: 21 MW
  • Water Capacity: None
  • Owner: AES Tietê SA
  • Shareholders: AES Corporation
  • Activity since: 2008

 

  • Contact: