contentmap_plugin
made with love from Joomla.it

 

  • Type: Dam, Hydro Power Plant
  • Area: Tocantins
  • River: Tocantins
  • Power Capacity: 902.5 MW (5 x 180.5 MW)
  • Water Capacity: 5,190 milion m3
  • Owner: Investco SA
  • Shareholders: EDP Energia SA (73%), Companhia Energética de Brasília (CEB) (20%) e Paulista Lajeado Energia SA (7%).
  • Activity since: 2002

 

  • Contact:

 

 

  • Other name: Luiz Eduardo Magalhaes Dam