September 2017
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
contentmap_plugin
made with love from Joomla.it

 

  • Type: Dam, Hydro Power Plant
  • Area: Rio Grande do Sur - Santa Catarina
  • River: Uruguai
  • Power Capacity: 855 MW (4 x 213.75 MW)
  • Water Capacity:
  • Owner: Foz do Chapecó Energia SA
  • Shareholders: CPFL (51%), Eletrobras Furnas (40%), Companhia Estadual de Geração e Transmissão de Energia Elétrica (CEEE-GT) (9%)
  • Activity since: 2011

 

  • Contact: