contentmap_plugin
made with love from Joomla.it

 

  • Type: Dam, Hydro Power Plant
  • Area: Minas Gerais
  • River: Araguari
  • Power Capacity: 240 MW (3 x 80 MW)
  • Water Capacity:
  • Owner: Consórcio Capim Branco Energia (CCBE)
  • Shareholders: Cemig (21%), Cia Vale do Rio Doce (CVRD) (49%), Suzano Papel e Celulose (18%), Votorantim Metais (13%)
  • Activity since: 2006

 

  • Contact: